At a glance
Short answer
DNO applications: G98 vs G99 cannot be judged from one national average; use the figures below as context and rely on a property survey, an itemised quotation and the rules that apply where you live.
What this guide covers
This page brings together dno applications: g98 vs g99, preparing you to compare written proposals without treating general guidance as a site-specific design.
For dno applications: g98 vs g99, check the trading identity, relevant certification, insurance and who carries contractual responsibility; A directory listing does not replace a written scope or competent design.
Current reference figures
- 14 days: For dno applications: g98 vs g99, the Consumer Contracts Regulations provide a 14-day cancellation period for many distance or off-premises contracts. Official context (accessed 27 September 2026).
- 16 A per phase: For dno applications: g98 vs g99, energy Networks Association defines the G98 limit as up to and including 16 A per phase. Official context (accessed 27 September 2026).
- 3.68 kW: For dno applications: g98 vs g99, on a single-phase supply, 16 A corresponds to 3.68 kW. Official context (accessed 27 September 2026).
For dno applications: g98 vs g99, these numbers are comparison anchors rather than promised costs, savings or performance; confirm the date, eligibility conditions and property assumptions behind every figure in a quotation.
How to compare proposals
For dno applications: g98 vs g99, make each bidder price the same scope and list exclusions; Keep drawings, calculations, product schedules, payment stages, cancellation information and the complaints route with the contract.
For dno applications: g98 vs g99, avoid large unexplained deposits and time-limited pressure; Confirm who owns applications, notifications, commissioning, warranties and post-installation support before work starts.
Worked household example
A three-bedroom semi-detached household in Leeds is assessing dno applications: g98 vs g99, so it records present energy use and asks three suppliers to quote the same scope; one quotation is set aside because access work and commissioning are omitted, a second gives a plausible headline result without its supporting calculation, and the third progresses because its survey, assumptions, exclusions, warranties and responsibilities can be checked line by line.
This dno applications: g98 vs g99 example does not identify a universally best product; it demonstrates why comparable evidence should influence the decision before the equipment choice does.
UK rules and responsibilities
For dno applications: g98 vs g99, check which planning, network, consumer-protection and funding requirements apply in the relevant UK nation; confirm the council, network operator and scheme administrator before signing, and request written cancellation information for a distance or off-premises contract.
Questions to ask
- What property evidence supports this recommendation?
- Which calculations determine the proposed specification?
- What work and permissions are excluded?
- Which warranties apply, and who handles claims?
- What commissioning evidence will I receive?
- Which current standards govern the work?
Independent sources
- Consumer Contracts Regulations (accessed 27 September 2026).
- Energy Networks Association G99 guide (accessed 27 September 2026).
Last updated .